YBM1 caisson series of prefabricated substation has a unique feature of our company Continental change, due to its caisson is fully enclosed structure, even if the built-in drain oil change problems occur, nor will the oil into the ground polluting the environment, therefore, it has environmentally friendly features.
Certificate
- 9001
Main Products
Automation equipment,Low and high voltage equipment