I.Features
1.Measure transformer No-load current, No-load loss, short circuit voltage, short circuit loss and capacity.
2.Three meters testing methods.
3.When making three phase transformer No-load, load test, the instrument will judge if the wiring is correct automatically, and shows three phase voltage, current vector diagram.
4.Finish load test under 1600kVA below distribution transformer full current for single machine. Finish 2500kVA below distribution transformer load test under 1/3 rated current (Under 1/3 rated current, the instrument can be converted to load loss parameters under rated current.)
5.All test results are corrected automatically. The instrument automatic correction as follows, waveform correction, temperature correction, Non rated voltage correction and non rated current correction. 6.The test results are more accurate.
7.320*240 high brightness LCD screen, with brightness adjustment. Touch buttons make the operation more convenient.
8.Real-time clock, reco
1.Measure transformer No-load current, No-load loss, short circuit voltage, short circuit loss and capacity.
2.Three meters testing methods.
3.When making three phase transformer No-load, load test, the instrument will judge if the wiring is correct automatically, and shows three phase voltage, current vector diagram.
4.Finish load test under 1600kVA below distribution transformer full current for single machine. Finish 2500kVA below distribution transformer load test under 1/3 rated current (Under 1/3 rated current, the instrument can be converted to load loss parameters under rated current.)
5.All test results are corrected automatically. The instrument automatic correction as follows, waveform correction, temperature correction, Non rated voltage correction and non rated current correction. 6.The test results are more accurate.
7.320*240 high brightness LCD screen, with brightness adjustment. Touch buttons make the operation more convenient.
8.Real-time clock, reco
Main Products
Petroleum instrument